Electronic components can affect the cost and schedule of a PCBA project. A useful quotation starts with the exact parts, the locations where they belong and clear rules for substitutions. Send a current BOM with your board files and assembly instructions so open sourcing questions can be identified before the build scope is agreed.

BOM Review
A bill of materials should connect each fitted component to its reference designators on the board. A description such as “10 kOhm resistor” is helpful, but it does not replace a manufacturer part number when package, tolerance or other specifications matter. Please identify the revision of the BOM and keep it aligned with the PCB and placement files.
- Part identity: list the manufacturer and exact part number where specified, along with the value, tolerance, voltage or other design-critical characteristics.
- Placement: include reference designators and quantity per board. Mark components that are intentionally not fitted rather than silently omitting them.
- Physical fit: show the package or footprint, and flag polarized parts, connectors, mechanical constraints and any customer-selected orientation.
- Purchasing rules: identify approved alternates, no-substitute items and any parts you plan to supply yourself. State source or lot-documentation requirements if they apply.
We review unclear or conflicting entries as engineering questions. For example, a BOM part number that does not match the assembly drawing, or two different footprints assigned to one item, should be resolved against the approved design before an order is released.
Substitutions Need Approval
If a specified component is unavailable, an alternative should be evaluated for more than price or pin count. Electrical ratings, pinout, package dimensions, thermal behavior, firmware dependencies and the intended application can all matter. For a connector, mating compatibility and mechanical height may be critical; for an active device, a similar description does not establish functional equivalence.
Mark in the BOM whether substitution is permitted for each item. If an alternative is proposed, compare it with the original requirement and record the exact proposed part number. The customer should approve any change before it is used in the build. A quoted alternative is not automatically an approved substitution.
Electronic Components and Order Scope
Availability can change between an initial inquiry and an approved purchase. Tell us the target build quantity, whether the work is a prototype or repeat order, and which components have long procurement windows or a fixed source requirement. If you already own parts, identify their quantity, packaging and any handling or documentation needs so the proposed sourcing split can be discussed.
The quotation should make component assumptions visible, including any unresolved items. Final availability, price, lead time and the handling of customer-supplied material must be confirmed for the specific order; this page is not a blanket stock or delivery promise.
Assembly Handoff
For a complete PCBA review, provide the PCB fabrication files, BOM, pick-and-place or centroid file, and an assembly drawing. Reference designators should match across the BOM and placement file. The placement data should identify each component’s position, rotation and board side where applicable. Clearly show polarity and orientation for parts such as diodes, LEDs, ICs and connectors when the files alone could be ambiguous.
Include programming files, assembly notes and a test procedure if the build requires them. State whether inspection, functional testing or a particular report format is requested. These requirements affect the scope to be reviewed; the available process and acceptance criteria should be agreed in the quotation rather than inferred from a generic service description.
Before You Request a Quote
Check that the BOM revision matches the PCB revision, every fitted designator has an intended part, and any do-not-fit positions are marked. Note approved alternatives and any items that must remain unchanged. Send the files together with your target quantity and the questions you want answered. If some details are not final, identify them explicitly so they can be tracked as open decisions.